Skip to content

SCIF Barrier Installation Detail & Current Instructions

Use the current ULTRA NT SOLID and PERFORATED installation instructions for the complete construction sequence and illustrated details.

Maintain at least 6 inches of finished sheet overlap and the 12-inch floor and ceiling returns shown in the guide. Apply approved conductive seam tape and coordinate penetrations, shielded components and bonding with the project design.

Download product-specific technical data, installation packages and test reports. Approved project details and acceptance requirements control the installation.